PROJECT SUMMARY
Oltmans Construction and Shubin + Donaldson Architects required a highly-visible exterior facade solution as part of the 101 Sepulveda Improvements Project in Los Angeles, California. Eide worked closely with the architectural firm to design, fabricate and install three tensioned facade panels engineered to meet City Building Codes of 110 MPH Wind Loads, Exposure “C”. Flame-retardant, Serge Ferrari FT 381 mesh fabric with digital graphics, covers each structure for an approximate combined textile area of 2,629 square feet.
Eide’s Tensile Facade Systems, which are comprised of framed supported flat panels with adjustable receiver brackets, allows flexibility for temporary take-down for maintenance, fabric tensioning and/or complete replacement for new branded renovations.
TECHNICAL INFORMATION
Project Name: 101 Sepulveda
Project Location: Los Angeles, CA
Year Completed: 2017
Membrane Type: Serge Ferrari FT 381
Wind Loads: 110 MPH Wind Loads
Total Project Size: Coverage Area 2,629 square feet